ZZ-NS111 Workstation Operation Instruction Manual

Cab assembly (side walls, floor plugs, low-speed alarm, rear mount) · Illustrated version of 5 operations | Compiled from the original process card for training and display

Install left side wall outer plugsInstall right side wall outer plugsInstall floor plugsInstall floor piping and harnessInstall body 4th mount
Cab assembly (side walls, floor plugs, low-speed alarm, rear mount) · Illustrated version of 5 operations | Compiled from the original process card for training and display
About the illustrations:
The original process card for this station repeatedly notes "see attached drawing / as shown in the figure", but the images embedded in the digital export are only the company logo and the "Controlled" version stamp — there are no actual process diagrams or photos. This page therefore does not show an illustration area. To view the original drawings, please check the official process card file in the paper system or PDM. 0100
Install left side wall outer plugs
Station NS111 · Standard time 1.2 min | Operation steps
Step 10: At the positions shown, on the left side wall outer panel, stick the Φ30 mm patch and Φ20 mm patches in sequence, install the Φ35 mm plug, Φ12 mm plugs and Φ16 mm plugs, and then install the Φ20 mm flanged plug. Note: keep the surface clean before sticking/installing, press the patches and plugs into place by hand, and ensure there is no lifting at the edges.
Parts required
Patch (Φ30 mm) ×1
Patch (Φ20 mm) ×3
Plug (Φ35 mm) ×1
Plug (Φ12 mm) ×3
Plug (Φ16 mm) ×5
Flanged plug (Φ20 mm) ×1
Install right side wall outer plugs
Station NS111 · Standard time 1.2 min | Operation steps
Step 10: At the positions shown, on the right side wall outer panel, stick the Φ30 mm patch and Φ20 mm patches in sequence, install the Φ35 mm plug, Φ12 mm plugs and Φ16 mm plugs, and then install the Φ20 mm flanged plug. Note: keep the surface clean before sticking/installing, press the patches and plugs into place by hand, and ensure there is no lifting at the edges.
Parts required
Patch (Φ30 mm) ×1
Patch (Φ20 mm) ×3
Plug (Φ35 mm) ×1
Plug (Φ12 mm) ×3
Plug (Φ16 mm) ×5
Flanged plug (Φ20 mm) ×1
Install floor plugs
Station NS111 · Standard time 1.2 min | Operation steps
Step 10: At the positions shown, install the Φ12 mm plugs and Φ16 mm plugs on the floor. Note: keep the surface clean before installation, press the plugs into place, and ensure there is no lifting at the edges.
Parts required
Plug (Φ12 mm) ×2
Plug (Φ16 mm) ×2
DC-DC converter ×1
Hex flange bolt (thick shank) ×4
Hex flange bolt (thick shank) ×4
Hex flange nut ×4
DCDC3 negative harness ×1
Install floor piping and harness
Station NS111 · Standard time 1.2 min | Operation steps
Step 10: Along the routes shown, lay out and secure each branch of the floor harness; all clips must be fully engaged, with none loose or hanging (use the EXACT-12 electric screwdriver to assist). Step 20: At the position shown, install the low-speed alarm module (AVAS) (fasten the bolts with a Phillips bit). Step 30: As required, secure and lay out the HVAC piping with fir-tree cable ties (fasten the bolts with an S8 socket). Step 40: At the position shown, install the rear evaporator to adapter piping assembly; bolt tightening torque (M8): 23±3 N·m, and it must be tightened strictly to this torque.
Parts required
Low-speed alarm module (AVAS) ×1
Hex flange bolt (thick shank) ×2
Fir-tree cable tie ×4
Rear evaporator to adapter piping assembly (as applicable) ×1
Hex flange bolt (thick shank, as applicable) ×1
Hex flange bolt (thick shank, as applicable) ×3
Tools / fixtures
EXACT-12 electric screwdriver
Phillips bit
S8 socket
✓ Quality inspection points
Rear evaporator adapter piping bolts (M8) tightening torque requirement: 23±3 N·m
Install body 4th mount
Station NS111 · Standard time 1.2 min | Operation steps
Step 10: On the sub-assembly bench, pre-assemble the body 4th mount (left and right) with the rear wall mounting plates, tightening in the sequence of 1 first, then 2 (using an impact wrench). Step 20: At the positions shown, pre-install all the bolts (pre-assembly, do not fully tighten yet) (using a Phillips bit). Step 30: Tighten in the sequence shown: first pre-tighten bolt 3 until the parts just make contact, then tighten bolt 4, then tighten bolt 5, and finally tighten bolt 3 (using an S18 socket). Step 40: At the position shown, install the body 4th mount support rod assembly; first tighten the primary locating hole bolt, then tighten the secondary locating hole bolt; tightening torque (M14): 200±10 N·m (using an S21 socket and the 4th mount sub-assembly bench; finally verify the tightening torque with a torque wrench and an 18×21 open-end wrench).
Parts required
Body 4th mount left ×1
Body 4th mount right ×1
Rear wall mounting plate ×2
Hex flange bolt (thick shank) ×4
All-metal hex flange lock nut ×4
Hex flange bolt (thick shank) ×8
Hex flange bolt with serrated washer face ×12
Hex flange bolt (thick shank) ×4
Body 4th mount support rod assembly ×1
Hex flange bolt (thick shank, fine thread) ×4
All-metal hex flange lock nut ×4
Tools / fixtures
Impact wrench
Phillips bit
S18 socket
S21 socket
4th mount sub-assembly bench
torque wrench
18×21 open-end wrench
✓ Quality inspection points
Body 4th mount to cab mounting bolts (Steps 10-40): tightening torque 200±10 N·m; inspection method is sampled static torque, 2 pieces per day (shift); importance is safety item (S); control method is inspection record card (△)