ZZ-NS100 Workstation Operation Instruction Manual

Cab Assembly (Roof, Grounding, A-Pillar Exterior Trim) · Illustrated version of 2 operations | Compiled from the original process card for training and display

Install roof assemblyInstall A-pillar exterior trim assembly
Cab Assembly (Roof, Grounding, A-Pillar Exterior Trim) · Illustrated version of 2 operations | Compiled from the original process card for training and display
About the illustrations:
The original process card for this station repeatedly notes "see attached drawing / as shown in the figure", but the images embedded in the digital export are only the company logo and the "Controlled" version stamp — there are no actual process diagrams or photos. This page therefore does not show an illustration area. To view the original drawings, please check the official process card file in the paper system or PDM. 0100
Install roof assembly
Station NS100 · Standard time 1.2 min | Operation steps
Step 10: As shown, apply sealant to the mating surface between the roof and the body sheet metal; at the left and right rear corners of the body-in-white, add extra sealant bead runs (see the schematic for details) to prevent defects such as broken beads, non-conforming cross-sections, or out-of-tolerance bead paths. Step 20: As shown, install the roof assembly: first complete the primary locating, then the auxiliary locating, to ensure the roof is positioned accurately and in place. Step 30: As shown, install the roof using hex flange self-drilling bolts, and complete the grounding connection of the roof harness at the same time. Roof bolts (M8) tightening torque: 23±3 N·m; grounding bolts (M6) tightening torque: 9±1 N·m — this is a safety-critical control point and must be strictly ensured.
Parts required
Roof assembly (with optional electronic mirror) ×1
Roof assembly (without optional electronic mirror) ×1
Hex flange bolt (thick shank) ×14
Hex flange self-drilling bolt ×2
Silane-modified adhesive (Huitian 7931) ×1 L
Tools / fixtures
EXACT-12 electric screwdriver
S10 socket
overhead crane
roof suction-cup spreader
glue gun
✓ Quality inspection points
Step 30: The grounding bolt tightening torque (M6) shall be controlled at 9±1 N·m, checked by sampling the static torque, 2 pieces per day/shift; this is a safety-critical (S-class) item and the inspection record card must be filled in (△).
Install A-pillar exterior trim assembly
Station NS100 · Standard time 1.2 min | Operation steps
Step 10: As shown, install the left and right A-pillar exterior trim assemblies respectively, with through-hole embedded plastic nut seats, fastened with cross-recessed pan-head self-tapping screws; tightening torque: 2±0.5 N·m.
Parts required
Right A-pillar exterior trim assembly ×1
Through-hole embedded plastic nut seat ×1
Cross-recessed pan-head self-tapping screw ×1
Left A-pillar exterior trim assembly ×1
Through-hole embedded plastic nut seat ×1
Cross-recessed pan-head self-tapping screw ×1
Tools / fixtures
EXACT-12 electric screwdriver
Phillips bit
This page is compiled from the WH platform ZZ-NS100 cab assembly process card (Anhui Windrose Holdings Co., Ltd.) and is for workshop visual training only; official production shall follow the controlled process documents.