700 km de autonomia carregado | 5 continentes | 0 emissões | Disponível em 2026
O caminhão elétrico mais global do mundo
Clique para pular
Reserve o seu Windrose →

5 strategic manufacturing locations across 3 continents

Windrose · Cadeia de fornecimento global

Manufacturing Partners

5 Assembly & Production Sites Across 3 Continents

Each region is served by a dedicated local manufacturing partner — enabling domestic delivery, regulatory compliance, and job creation in-market.

🇬🇧 United Kingdom
HORIBA MIRA UK — Validation Complete
🇨🇳 China · Shiyan
Hande — Electric Drive Axle
🇧🇪 Belgium
European assembly HQ · 2025
🇫🇷 France
ENGIE Vianeo — Heavy-Duty Electrification
🇺🇸 United States
Aertssen + Windrose — USA Assembly Sites

Principais fornecedores de componentes

A plataforma aberta da Windrose combina integração interna com fornecedores globais de primeira linha

Eixo de tração elétrico
Hande

Hande integrated e-axle — 4-motor direct drive

Eixo elétrico integrado com motor de tração, redução e carcaça do eixo

Bateria
CALB

CALB LFP 705 kWh modular battery system

Células e módulos de bateria de lítio de alta tensão para o grupo motopropulsor

Cabine do camião
Zhenghe

Zhenghe cab structure — European cab homologation certified

Estruturas de cabine e carroçaria para a unidade tratora

Belgium Assembly
Antwerp
Developer Van Wellen Group

European assembly hub at the Port of Antwerp-Bruges, serving Van Wellen Group's fleet operations.

France Assembly
Valenciennes
Developer PRD

Assembly site in Valenciennes, northern France, serving PRD's logistics operations.

US Assembly · Tacoma, WA
Aertssen

Final assembly of North American units at Tacoma, Washington, enabling domestic delivery and Buy America compliance.

US Assembly · Savannah, GA
Aertssen

Final assembly of North American units at Rincon, Georgia (Savannah metro), enabling domestic delivery and Buy America compliance.

Montagem local

Montagem final local — Passo a passo

Seven straightforward steps — any certified local partner, no specialist tooling required. Reduces logistics cost, creates local jobs, enables rapid market entry across 5 continents.

Step 01: Bare Chassis
PASSO 01
Bare Chassis
The structural backbone — lightweight frame ready to receive all modules
Step 02: Battery Pack
PASSO 02
Battery Pack
High-voltage packs drop into the chassis floor, lowering centre of gravity
Step 03: Drive Axle
PASSO 03
Drive Axle
Proprietary electric drive axle — motor, gearbox and brakes in one unit
Step 04: Wheels & Tyres
PASSO 04
Wheels & Tyres
Heavy-duty tyres fitted — chassis is now road-mobile
Step 05: Cab
PASSO 05
Cab
Aerodynamic cab module mounted, housing driver controls and HVAC
Step 06: Rear Integration
PASSO 06
Rear Integration
Fifth-wheel, charging sockets, lighting and rear fairings fitted
Step 07: Complete Truck
PASSO 07
Complete Truck
Final inspection, software commissioning, ready to haul