700 km rekkevidde lastet | 5 kontinenter | 0 utslipp | Klar nå i 2026
Verdens mest globale elektriske lastebil
Klikk for å hoppe over
Reserver din Windrose →

5 strategiske produksjonssteder på 3 kontinenter

Windrose · Global produksjonsforsyningskjede

Manufacturing Partners

5 Assembly & Production Sites Across 3 Continents

Each region is served by a dedicated local manufacturing partner — enabling domestic delivery, regulatory compliance, and job creation in-market.

🇬🇧 United Kingdom
HORIBA MIRA UK — Validation Complete
🇨🇳 China · Shiyan
Hande — Electric Drive Axle
🇧🇪 Belgium
European assembly HQ · 2025
🇫🇷 France
ENGIE Vianeo — Heavy-Duty Electrification
🇺🇸 United States
Aertssen + Windrose — USA Assembly Sites

Viktige komponentleverandører

Windrose åpne plattform kombinerer intern integrasjon med beste globale leverandører

Elektrisk drivaksel
Hande

Hande integrated e-axle — 4-motor direct drive

Integrert e-aksel med driftsmotor, reduksjonsgir og akselbolig

Batteri
CALB

CALB LFP 705 kWh modular battery system

Høyspente litiumceller og -moduler som driver drivlinjen

Lastebilkabin
Zhenghe

Zhenghe cab structure — European cab homologation certified

Kabinstrukturer og karosseri for trekkaggregatet

Belgium Assembly
Antwerp
Developer Van Wellen Group

European assembly hub at the Port of Antwerp-Bruges, serving Van Wellen Group's fleet operations.

France Assembly
Valenciennes
Developer PRD

Assembly site in Valenciennes, northern France, serving PRD's logistics operations.

US Assembly · Tacoma, WA
Aertssen

Final assembly of North American units at Tacoma, Washington, enabling domestic delivery and Buy America compliance.

US Assembly · Savannah, GA
Aertssen

Final assembly of North American units at Rincon, Georgia (Savannah metro), enabling domestic delivery and Buy America compliance.

Lokal montering

Lokal sluttmontering — Trinn for trinn

Sju enkle trinn — enhver sertifisert lokal partner, ingen spesialverktøy nødvendig. Reduserer logistikkostnader, skaper lokale arbeidsplasser og muliggjør rask markedsinntreden på 5 kontinenter.

Step 01: Bare Chassis
TRINN 01
Bare Chassis
The structural backbone — lightweight frame ready to receive all modules
Step 02: Battery Pack
TRINN 02
Battery Pack
High-voltage packs drop into the chassis floor, lowering centre of gravity
Step 03: Drive Axle
TRINN 03
Drive Axle
Proprietary electric drive axle — motor, gearbox and brakes in one unit
Step 04: Wheels & Tyres
TRINN 04
Wheels & Tyres
Heavy-duty tyres fitted — chassis is now road-mobile
Step 05: Cab
TRINN 05
Cab
Aerodynamic cab module mounted, housing driver controls and HVAC
Step 06: Rear Integration
TRINN 06
Rear Integration
Fifth-wheel, charging sockets, lighting and rear fairings fitted
Step 07: Complete Truck
TRINN 07
Complete Truck
Final inspection, software commissioning, ready to haul