700 km á fullri hleðslu | 5 heimsálfar | 0 losun | Tilbúið 2026
Heimsins mest alþjóðlegi rafmagnskrakkinn
Smelltu til að sleppa
Pantaðu Windrose þinn →

5 stefnumótandi framleiðslustaðir á 3 heimsálfum

Windrose · Alþjóðleg aðfangakeðja framleiðslu

Assembly Sites

Assembly Sites Across 4 Locations

Each region is served by a dedicated local assembly partner — enabling domestic delivery, regulatory compliance, and job creation in-market.

Windrose truck with Région Hauts-de-France banner at the Onnaing/Valenciennes announcement
🇫🇷 France
Valenciennes — Northern France Assembly · PRD
Windrose Park Antwerp — assembly facility with wind turbine and charging area
🇧🇪 Belgium
Port of Antwerp-Bruges — European Assembly HQ
Windrose truck at the HORIBA MIRA proving ground, United Kingdom
🇬🇧 United Kingdom
HORIBA MIRA UK — Validation & Homologation
Windrose truck at the Aertssen US assembly facility
🇺🇸 United States
Aertssen + Windrose — Tacoma & Savannah Assembly

E700 Bill of Materials

Efnislisti framleiðsla & þjónusta

The complete parts catalogue behind the E700 — every assembly and component with part numbers, weights, materials and market fitment. Open a system below to explore the full interactive BOM.

1,334 components 96 assemblies 8 vehicle systems 77% shared between EU & US builds
Powertrain & Drive 3 assemblies · 98 parts 🔋 Energy Storage 2 assemblies · 62 parts 🔌 Aflrafeindatækni & hleðsla 5 assemblies · 109 parts 🏗️ Chassis & Structure 7 assemblies · 99 parts 🔧 Suspension & Brakes 10 assemblies · 260 parts 🛡️ Safety & ADAS 5 assemblies · 48 parts 🚛 Cab & Body 52 assemblies · 484 parts 🖥️ Electronics & Connectivity 11 assemblies · 174 parts
Open the full BOM →

Staðbundin samsetning

Staðbundin samsetning í lokaskrefum — Skref fyrir skref

Sjö einfald skref – hver sem er staðfestur staðbundinn samstarfsaðili, engin sérsniðin tól þarf. Lækkar flutningskostnað, skapar staðbundin störf og gerir kleift hraða markaðsinngöngu á fimm meginlöndum.

Workstation Operation Instruction Manuals
Detailed assembly steps for every station on the E700 production line — 26 workstations, fully illustrated.
Open Manuals →
Step 01: Bare Chassis
SKREF 01
Bare Chassis
The structural backbone — lightweight frame ready to receive all modules
Step 02: Battery Pack
SKREF 02
Rafhlöðupakki
High-voltage packs drop into the chassis floor, lowering centre of gravity
Step 03: Drive Axle
SKREF 03
Drive Axle
Proprietary electric drive axle — motor, gearbox and brakes in one unit
Step 04: Wheels & Tyres
SKREF 04
Wheels & Tyres
Heavy-duty tyres fitted — chassis is now road-mobile
Step 05: Cab
SKREF 05
Cab
Aerodynamic cab module mounted, housing driver controls and HVAC
Step 06: Rear Integration
SKREF 06
Rear Integration
Fifth-wheel, charging sockets, lighting and rear fairings fitted
Step 07: Complete Truck
SKREF 07
Complete Truck
Final inspection, software commissioning, ready to haul