700 km de portée en charge | 5 continents | 0 émissions | Disponible en 2026
Le camion électrique le plus mondial au monde
Cliquer pour ignorer
Réservez votre Windrose →

5 strategic manufacturing locations across 3 continents

Windrose · Chaîne d'approvisionnement mondiale

Manufacturing Partners

5 Assembly & Production Sites Across 3 Continents

Each region is served by a dedicated local manufacturing partner — enabling domestic delivery, regulatory compliance, and job creation in-market.

🇬🇧 United Kingdom
HORIBA MIRA UK — Validation Complete
🇨🇳 China · Shiyan
Hande — Electric Drive Axle
🇧🇪 Belgium
European assembly HQ · 2025
🇫🇷 France
ENGIE Vianeo — Heavy-Duty Electrification
🇺🇸 United States
Aertssen + Windrose — USA Assembly Sites

Principaux fournisseurs de composants

La plateforme ouverte de Windrose associe une intégration interne à des fournisseurs mondiaux de premier plan

Essieu moteur électrique
Hande

Hande integrated e-axle — 4-motor direct drive

Essieu électrique intégré combinant le moteur, la réduction et le carter d'essieu

Batterie
CALB

CALB LFP 705 kWh modular battery system

Cellules et modules de batteries lithium haute tension alimentant le groupe motopropulseur

Cabine du camion
Zhenghe

Zhenghe cab structure — European cab homologation certified

Structures de cabine conducteur et carrosserie pour l'unité tractrice

Belgium Assembly
Antwerp
Developer Van Wellen Group

European assembly hub at the Port of Antwerp-Bruges, serving Van Wellen Group's fleet operations.

France Assembly
Valenciennes
Developer PRD

Assembly site in Valenciennes, northern France, serving PRD's logistics operations.

US Assembly · Tacoma, WA
Aertssen

Final assembly of North American units at Tacoma, Washington, enabling domestic delivery and Buy America compliance.

US Assembly · Savannah, GA
Aertssen

Final assembly of North American units at Rincon, Georgia (Savannah metro), enabling domestic delivery and Buy America compliance.

Assemblage local

Assemblage final local — Étape par étape

Seven straightforward steps — any certified local partner, no specialist tooling required. Reduces logistics cost, creates local jobs, enables rapid market entry across 5 continents.

Step 01: Bare Chassis
ÉTAPE 01
Bare Chassis
The structural backbone — lightweight frame ready to receive all modules
Step 02: Battery Pack
ÉTAPE 02
Battery Pack
High-voltage packs drop into the chassis floor, lowering centre of gravity
Step 03: Drive Axle
ÉTAPE 03
Drive Axle
Proprietary electric drive axle — motor, gearbox and brakes in one unit
Step 04: Wheels & Tyres
ÉTAPE 04
Wheels & Tyres
Heavy-duty tyres fitted — chassis is now road-mobile
Step 05: Cab
ÉTAPE 05
Cab
Aerodynamic cab module mounted, housing driver controls and HVAC
Step 06: Rear Integration
ÉTAPE 06
Rear Integration
Fifth-wheel, charging sockets, lighting and rear fairings fitted
Step 07: Complete Truck
ÉTAPE 07
Complete Truck
Final inspection, software commissioning, ready to haul