the Grid
Windrose Grid is the product we start with: charge a 2 MWh Windrose Power unit at wind, solar or hydro, haul it on a Windrose Truck, and feed Compute and other trucks at the site. At Antwerp the plant also takes wind by direct line behind the meter; the mobile loop is for sites that still wait on a grid study.
- 1Wind · solar · hydro charge a Windrose Power unit
- 2A Windrose Truck hauls the charged unit to the site
- 3Docked at the site, it feeds Windrose Compute
- 4and charges the other Windrose Trucks
The wind around the factory
Every wind turbine within 15 km of the Antwerp hall, from OpenStreetMap: 113 machines, of which 12 sit inside 2 km and total 37.6 MW. The nearest, LH-01, stands 464 m away. Zoom from the 120 km view down to the parcel; click a distance band below to drill in.
| Band | Turbines | Rated MW | Of which rated |
|---|
Turbine positions and ratings from OpenStreetMap, 15 km radius of the parcel. Rated output is tagged on some machines only, so the MW column is a floor — within 2 km every turbine is rated and the 37.6 MW figure is complete.